Matt started by excavating to grade the area for the barn. He then shapes sides and swales for water to flow away from structure.

Matt started by excavating to grade the area for the barn. He then shapes sides and swales for water to flow away from structure.

Matt had to maintain the backwall and was restricted to go back any further because of Septic Lateral running behind structure area.

Matt had to maintain the backwall and was restricted to go back any further because of Septic Lateral running behind structure area.

Area was also raised for the driveway leading to the new barn construction.

Area was also raised for the driveway leading to the new barn construction.

Total lif and fill was around 18" for the driveway. 12" culvert pipe was also installed.